| Save | S.N. | Project Title | Public Entity Name |
Envelope |
Published |
Deadline |
Procurement Type | Location |
Security |
|
|---|---|---|---|---|---|---|---|---|---|---|
| 351 |
Construction of Akalgharwa S3/T1 Tertiraty Canal and its Associated Structures
sip/cad/abc/ncb-24/082-83 |
Sikta Irrigation Project | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Water / Irrigation / Canal |
Lumbini
Banke |
14 lakh | ||
| 352 |
Construction of Akalgharwa Sub-Secondary Canal and its Associated Structures
sip/cad/abc/ncb-23/082-83 |
Sikta Irrigation Project | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Water / Irrigation / Canal |
Lumbini
Banke |
25 lakh | ||
| 353 |
Upgrading to Gravel Road standard of Tamor Corridor ( Ella danda to OlanchungGola section); Ch: 183+500 to Ch: 196+500
tcsdorp/337011744/2082/83-007 |
Tamor Corridor (Subhangkhola-Dobhan-olangchunggola) Road Project | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Koshi
Taplejung |
1.1 cr | ||
| 354 |
Reactive Maintenance Works along Rapti Rajmarga Road (NH 55) from Shitalpati -Patalaychaur. (CH 82+000- CH 129+100)., C.I.N: RDDNG/33731011-3/082/83-46
rddng/082/83-46 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
1.1 lakh | ||
| 355 |
Reactive Maintenance Works along Rapti Rajmarga (NH55) Road from Kapurkot to Solabang ( CH 49+000-58+000) and Sankamulpool to Shreenagar (CH 71+800- CH 82+100)., C.I.N: RDDNG/33731011-3/082/83-45
rddng/082/83-45 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
65 k | ||
| 356 |
Reactive Maintenance Works along Sitalpati-Khalanga-Baluwasangrahi Road Section (NH 09) from Shitalpati -Khalanga. (CH 0+000 to CH 21+100)., C.I.N: RDDNG/33731011-3/082/83-44
rddng/082/83-44 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
50 k | ||
| 357 |
Recurrent Maintenance Works along Raptirajmarg NH 55 ( at ch 17+000-29+000) in Dang District., C.I.N: RDDNG/33731011-3/082/83-43
rddng/082/83-43 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
1.3 lakh | ||
| 358 |
Reactive Maintenance Works along Koilabas- Belbhar-Ghorahi NH 54 (Koilabas- Lamahi-Belbhar-Ghorahi Section) Road in Dang District at ch km 0+000 to km 56+000, Dang District., C.I.N: RDDNG/33731011-3/082/83-42
rddng/082/83-42 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
1.5 lakh | ||
| 359 |
Reactive Maintenance Works along Gadhawa- Gangadi Hulaki Rajmarga NH 05 (Khardariya - Gangadi Section) Road in Dang District at ch km 0+000 to km 23+000, Dang District., C.I.N: RDDNG/33731011-3/082/83-41
rddng/082/83-41 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
60 k | ||
| 360 |
Reactive Maintenance Works along MRM (Lamahi-Shiva Khola Section) Road at Chainage km 715+000 to km 753+000 in Dang District., C.I.N: RDDNG/33731011-3/082/83-40
rddng/082/83-40 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
1.3 lakh | ||
| 361 |
Recurrent Maintenance Works along Bakhra Farm to Tapa Chowk Road Section of Loharpani - Ghorahi Road (NH19) in Dang District., C.I.N: RDDNG/33731011-3/082/83-39
rddng/082/83-39 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
1.2 lakh | ||
| 362 |
Reactive Maintenance Works along Tulsipur- Purandhara- Kalimati- Kalche Road (NH09) ( Ch 857+740 to Ch 876+060) in Dang District., C.I.N: RDDNG/33731011-3/082/83-38
rddng/082/83-10 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
1.5 lakh | ||
| 363 |
Recurrent Maintenance Works along Rapti Rajmarg (Birendra Chowk to Lahuri Khola, Ch. 30+000 to 35+000), Dang District., C.I.N: RDDNG/33731011-3/082/83-37
rddng/082-83-10 |
402 Road Division, Dang | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Dang |
1 lakh | ||
| 364 |
Steel structure painting works
nea-thps-2082/83-cst-06 |
NEA, Trishuli Hydropower Station | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Building / Hall / Lab |
Bagmati
Nuwakot |
1.5 lakh | ||
| 365 |
Fabrication, Supply, Transportation, Construction and Erection of Bharcha Khola Damodar Kunda Suspended Trail Bridge, Mustang over Bharcha river, span 470m.
ncb-ur-30/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Gandaki
Mustang |
32.5 lakh | ||
| 366 |
Fabrication, Supply, Transportation, Construction and Erection of UN Park Truss Trail Bridge, Kathmandu over Bagmati Khola, span 40m.
ncb-ur-29/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Kathmandu |
4.8 lakh | ||
| 367 |
Fabrication, Supply, Transportation, Construction and Erection of School danda Steel Truss Trail Bridge, Morang over Gachhiya Khola, span 80m.
ncb-ur-28/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Morang |
7.9 lakh | ||
| 368 |
Fabrication, Supply, Transportation, Construction and Erection of Pipledovan Suspension Trail Bridge, Kavrepalanchowk over Roshi river, span 255.5m.
ncb-ur-27/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Kavrepalanchok |
11.9 lakh | ||
| 369 |
Fabrication, Supply, Transportation, Construction and Erection of Paschim Biring Suspension Trail Bridge, Jhapa over Bering river, span 355m
ncb-ur-26/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Jhapa |
22.1 lakh | ||
| 370 |
Fabrication, Supply, Transportation, Construction and Erection of Patlekhet Mauwaphant Suspended Trail Bridge, Myagdi over Raghuganga river, span 470m
ncb-ur-25/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Gandaki
Myagdi |
17.9 lakh | ||
| 371 |
Fabrication, Supply, Transportation, Construction and Erection of Kyogma Suspended Trail Bridge, Gorkha over Budhigandaki river, span 220m : Remaining Scopes of works Under previously terminated contract through Construction Turnkey Package (CTP)
ncb-ls-36/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Gandaki
Gorkha |
12 lakh | ||
| 372 |
Fabrication, Supply, Transportation, Construction and Erection of Thumibudhegara and Likhu khola Trail bridges: Remaining Scopes of works Under previously terminated contract through Construction Turnkey Package (CTP)
ncb-ls-34/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Lalitpur |
6.5 lakh | ||
| 373 |
Fabrication, Supply, Transportation, Construction and Erection of Khagad Suspended Trail Bridge, Humla over khagad river, span 360m through Construction turnkey Package.
ncb-ls-32/082/83. |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Karnali
Humla |
14.7 lakh | ||
| 374 |
Fabrication, Supply, Transportation, Construction and Erection of Pilampa Suspended Trail Bridge, Khotang over Pilampa river, span 182m : Remaining Scopes of works Under previously terminated contract through Construction Turnkey Package
ncb-ls--35/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Khotang |
2 lakh | ||
| 375 |
Design and Build of Arun Nadi Pul, Chhabbise, Sitalpati-6, Heluwabeshi, Sankhuwasabha ra Kulung -3, Bunglingtar, Bhojpur Bich.
lidpoith/ncb/w/db/2082-083/06 |
Local Infrastructure Developmemt Project Office, Itahari | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Sankhuwasabha |
1.1 cr | ||
| 376 |
Design and Build of Bhojpur ra Sankhuwasabha Jodne Sathighat Arun Nadi Mathiko Pakki Pul Nirman, Bhojpur
lidpoith/ncb/w/db/2082-083/05 |
Local Infrastructure Developmemt Project Office, Itahari | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Bhojpur |
1.3 cr | ||
| 377 |
Design and Build of Gauradaha Wada No.5 Chandu Kholama Pul,Jhapa
lidpoith/ncb/w/db/2082-083/04 |
Local Infrastructure Developmemt Project Office, Itahari | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Jhapa |
16.1 lakh | ||
| 378 |
Design and Build of Simlebata Dasmure Jodne Sorung Khola Pakki Pul,Udayapur,Katari Nagarpalika-10
lidpoith/ncb/w/db/2082-083/03 |
Local Infrastructure Developmemt Project Office, Itahari | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Udayapur |
27.1 lakh | ||
| 379 |
Design and Build of Srilanka Tole ra Chatpate Tole Jodne Kali Kholama DPR sahit Pul Nirman,Chau.Na.Pa,-04,Udayapur
lidpoith/ncb/w/db/2082-083/02 |
Local Infrastructure Developmemt Project Office, Itahari | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Udayapur |
26.9 lakh | ||
| 380 |
Design and Build of Jhoratol Baghchauri sadak ko Saraswati Kholama Pakki Pul Nirman,Triyuga Na.Pa.Udayapur
lidpoith/ncb/w/db/2082-083/01 |
Local Infrastructure Developmemt Project Office, Itahari | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Udayapur |
28.4 lakh | ||
| 381 |
Construction of Tallochauri and Khagauli (Gaudi) Jodne Sadak Pul, Lamkichuha-05 & Janaki-02, Kailali
lidpo/dhn/ifb/works/03/082-83-1 |
Local Infrastructure Development Project Office, Dhangadhi | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Sudur Pashchim
Kailali |
15.7 lakh | ||
| 382 |
Design and Build of Puntura Khola Sadak Pul, Parashuram Na.Pa.-6 & 12 Dadeldhura
lidpo/dhn/ifb/works/03/082-83 |
Local Infrastructure Development Project Office, Dhangadhi | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Sudur Pashchim
Dadeldhura |
87.7 lakh | ||
| 383 |
Design and Build of Aurahi Khola Motorable Bridge at Thakurbaba Municipality, Bardiya
lidpo/btl/ncb/db/bri/082-83/07 |
Local Infrastructure Development Project Office(LIDPO), Lumbini Province,Butwal | Two (1S2E) | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Lumbini
Bardiya |
70 lakh | ||
| 384 |
Supply,Fabrication,Transportation, Erection & Construction of 32 m long span and walkway width 150 Cm Namaste Jharna Truss Bridge Sangurigadhi-6, Dhankuta through Construction Turnkey Package(CTP).
ido-dkt/w/ncb/tb-01/082-83 |
Infrastructure Development Office, Dhankuta | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Koshi
Dhankuta |
1.5 lakh | ||
| 385 |
Roadway Upgrading of Dadagaun Uppallo Gohore Badare Ranghashala Siranchowk -7, Gorkha
08/rddml-082/83-33 |
Road Division, Damauli | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Gandaki
Gorkha |
1.2 lakh | ||
| 386 |
Roadway Construction Works of Gairigaun, Dhungefaat, Sano Khola Katahare Khola Karki Gaun Bhulbhule Dhara Thulo Chautaro Road, Bhanu Municipality, Tanahun
08/rddml-082/83-32 |
Road Division, Damauli | Single | 16/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Gandaki
Tanahun |
1.9 lakh | ||
| 387 |
Infrastructure Development Work at Ganatantra Smarak Park kathmandu District
fudbc/ktm/nbc/works-51/082/83 |
Office of Federal Urban Development and Building Construction, Kathmandu | Two (1S2E) | 16/07/2026 |
07/08/2026
(10 days) |
Works
(NCB)
Park/Field/Public Space |
Bagmati
Kathmandu |
7.4 lakh | ||
| 388 |
Remaining Construction Works of Swimming Pool in Children Park, BMC-19
96-bmc/082/083/w/ncb/228 |
Bharatpur Metropolitian City Office | Single | 16/07/2026 |
07/08/2026
(10 days) |
Works
(NCB)
Park/Field/Public Space |
Bagmati
Chitwan |
1.8 lakh | ||
| 389 |
Rehabilitation and Construction of Pedari Branch Canal (S5), Ghiya Taal Canal System and Associated Structures
sip/cad/ped/ncb-13/082-83 |
Sikta Irrigation Project | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Water / Irrigation / Canal |
Lumbini
Banke |
20 lakh | ||
| 390 |
Construction of Guruwagaun Sub-secondary Canal (S6SS4), Tertiary Canal and Associated Structures
sip/cad/gbc/ncb-12/082-83 |
Sikta Irrigation Project | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Water / Irrigation / Canal |
Lumbini
Banke |
40 lakh | ||
| 391 |
Design and Build of Chaukhola Bridge Along Manma Jumla Road Section, Karnali Highway, Kalikot
dor-bb-db-082/83-02-6 |
Department of Roads, Bridge Branch | Two (1S2E) | 16/07/2026 |
17/08/2026
(20 days) |
Works
(NCB)
Bridge/Culvert |
Karnali
Kalikot |
25.5 lakh | ||
| 392 |
Design and Build of Khudi Khola Bridge along Along Dumre besishahar Chame Road, Lamjung
dor-bb-db-082/83-02-5 |
Department of Roads, Bridge Branch | Two (1S2E) | 16/07/2026 |
17/08/2026
(20 days) |
Works
(NCB)
Bridge/Culvert |
Gandaki
Lamjung |
21.3 lakh | ||
| 393 |
Design and Build of Babai River Bridge, Along Amelia-Tulsipur-Shitalpati-Tharmare-Musikot (NH55), Dang
dor-bb-db-082/83-02-4 |
Department of Roads, Bridge Branch | Two (1S2E) | 16/07/2026 |
17/08/2026
(20 days) |
Works
(NCB)
Bridge/Culvert |
Lumbini
Dang |
1.2 cr | ||
| 394 |
Design and Build of Rangun Khola Bridge Along Mahakali Corridor, Connecting Parashuram Na.pa. 6 and 5, Dadeldhura.
dor-bb-db-082/83-02-3 |
Department of Roads, Bridge Branch | Two (1S2E) | 16/07/2026 |
17/08/2026
(20 days) |
Works
(NCB)
Bridge/Culvert |
Sudur Pashchim
Dadeldhura |
1.9 cr | ||
| 395 |
Design and Build of 2 Bridges: 1. Seragad Khola Bridge, and 2. Bicchanda Khola Bridge, Along Dhangadhi-Khutiya-Dipayal Road Section, Doti.
dor-bb-db-082/83-02-2 |
Department of Roads, Bridge Branch | Two (1S2E) | 16/07/2026 |
17/08/2026
(20 days) |
Works
(NCB)
Bridge/Culvert |
Sudur Pashchim
Doti |
73.6 lakh | ||
| 396 |
Design and Build of 3 Bridges: 1. Pul 6, Along Seti Rajmarga, kailali-Doti-Achham, Kailali. 2. Pul 3 Nirman, Along Bauniya (Maram) to Sanphebagar Road, Seti Rajmarga, Kailali. 3. Pul 13, Along Seti Rajmarga, kailali-Doti-Achham, Doti.
dor-bb-db-082/83-02-1 |
Department of Roads, Bridge Branch | Two (1S2E) | 16/07/2026 |
17/08/2026
(20 days) |
Works
(NCB)
Bridge/Culvert |
Sudur Pashchim
Kailali |
2.3 cr | ||
| 397 |
Air Ticket for International Ticketing Service for 20th Asian Games.
ncb/goods/airticket/83/84 |
National Sports Council | โ | 16/07/2026 |
06/08/2026
(9 days) |
Goods
(NCB)
Aviation/Airline |
Bagmati
Kathmandu |
15.1 lakh | ||
| 398 |
Supply of Security Gaurd for Gorkha Polytechnic Institute, Palaungtar, Gorkha
ctevt-gpi-security-bid-2083/84-01 |
Council For Technical Education Vocational Training (CTEVT) | โ | 16/07/2026 |
06/08/2026
(9 days) |
Goods
(NCB)
HR/Manpower |
Gandaki
Gorkha |
N/A | ||
| 399 |
Supply of Security Gaurds for Balaju School of Engineering and Technology, BSET, Balaju
bset/ncb/security-2082/83-01 |
Council For Technical Education Vocational Training (CTEVT) | โ | 16/07/2026 |
06/08/2026
(9 days) |
Goods
(NCB)
HR/Manpower |
Bagmati
Kathmandu |
N/A | ||
| 400 |
Supply and Delivery of Radar Spare Parts and Other Equipment Required for Weather Radar Operation
brch/g/ncb/01-2083/84 |
Building Resilience to Climate-Related Hazards Project | โ | 16/07/2026 |
10/08/2026
(13 days) |
Goods
(NCB)
Electronics/Computers |
Bagmati
Kathmandu |
41 lakh |