| Save | S.N. | Project Title | Public Entity Name |
Published |
Deadline |
Procurement Type | Location |
Security |
Doc Fee |
|
|---|---|---|---|---|---|---|---|---|---|---|
| 301 |
HT/ LT Electrification work and Transformer Installation Work at Nirmalbasti (Thori-4) Parsa District
gwipc/elec/sq-5 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Parsa |
32 k | 1 k | ||
| 302 |
HT/ LT Electrification work and Transformer Installation Work at Aathghare (Thori-4) Parsa District
gwipc/elec/sq-4 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Parsa |
30 k | 1 k | ||
| 303 |
HT/ LT Electrification work and Transformer Installation Work at Hanumanagar (Thori-2) Parsa District
gwipc/elec/sq-3 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Parsa |
30 k | 1 k | ||
| 304 |
HT/ LT Electrification work and Transformer Installation Work at Kerung ghol lift irrigation Chitwan
gwipc/elec/sq-01 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Bagmati
Chitwan |
32 k | 1 k | ||
| 305 |
Construction of 200 mm (8") dia. Deep Tubewell by DTH Method at Jasbirchowk (Ratnanagar-15) and Pithuwa (Ratnanagar-16) of Chitwan District
gwipc/dtw/sq-5 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Bagmati
Chitwan |
38 k | 1 k | ||
| 306 |
Construction of 200 mm (8") dia. Deep Tubewell by DTH Method at Tungara (Khaireni-3) and Suryamanitole (Khaireni-4) of Chitwan District
gwipc/dtw/sq-4 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Bagmati
Chitwan |
38 k | 1 k | ||
| 307 |
Construction of 200 mm (8") dia. Deep Tubewell by DTH Method at Puspanjalichowk (Kawasoti-5) and Bagnasetole (Kawasoti-4) of East Nawalparasi District
gwipc/dtw/sq-3 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Lumbini
NawalParasi |
45 k | 1 k | ||
| 308 |
Construction of 200 mm (8") dia. Deep Tubewell by DTH Method at Shankharchowk (Bharatpur-20) and Gopalgunj (Bharatpur-15) of Chitwan District
gwipc/dtw/sq-2 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Bagmati
Chitwan |
38 k | 1 k | ||
| 309 |
Construction of 200 mm (8") dia. Deep Tubewell by DTH Method at Sukranagar (Bharatpur-25) and Hanumanagar (Bharatpur-14) of Chitwan District
gwipc/dtw/sq-1 |
Groundwater Irrigation Project | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Bagmati
Chitwan |
38 k | 1 k | ||
| 310 |
Bhojpur Multiple Campus Compound Wall Construction Work, Bhojpur
bmc/w/sq/02-2082/83 |
Bhojpur Multiple Campus | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Road |
Koshi
Bhojpur |
51.6 k | 1 k | ||
| 311 |
Construction of Road Crossing(Escape) and VRB, EMC, Manpur BC, Barhathwa SBC
bip/manpur/sq-9/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Road |
Madesh
Sarlahi |
50 k | 1 k | ||
| 312 |
Canal maintenance and Lining Works at various chainage of Barhathwa SBC
bip/manpur/sq-10/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
50 k | 1 k | ||
| 313 |
RCC Canal lining construction works in GA/SR0 Secondary outlet From CH-5+550 ,right side of Gadhaiya Branch Canal
bip/gadhaiyasq-10/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
51 k | 1 k | ||
| 314 |
RCC Canal lining construction works in GA/SL2 From CH-6+720 Of left side of Gadhaiya Branch Canal
bip/gadhaiya/sq-9/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
51 k | 1 k | ||
| 315 |
Rcc Canal lining Construction works in SL1 Secondary outlet ,left side of Gadhaiya Branch Canal
bip/gadhaiya/sq-8/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
51 k | 1 k | ||
| 316 |
RCC Canal Lining Construction Works & Canal maintenance works in SR1 Secondary outlet from CH-0+480,Right of Dhangdha Distributary
bip/gadhaiya/sq-7/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
51 k | 1 k | ||
| 317 |
Command Area Protection Works in Hariwon khola ,Tinghare Naya Baste ,bagmati-3,Sarlahi
bip/emc/sq-2/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
51 k | 1 k | ||
| 318 |
Command Area protection Area in Hariwon khola,Tinghare Naya Baste,Bagmati-3
bip/emc/sq-1/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
51 k | 1 k | ||
| 319 |
Construction of RCC Canal lining work in WMC-Baghi-BC-Hariharpur-SL2
bip/baghi/sq-5/082-083 |
Bagmati Irrigation Project, Karmaiya, Sarlahi. | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Water / Irrigation / Canal |
Madesh
Sarlahi |
51 k | 1 k | ||
| 320 |
Construction of Gravel Road at Different Section of BMC-26
83-bmc/082/083/w/sq/205 |
Bharatpur Metropolitian City Office | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Road |
Bagmati
Chitwan |
20 k | 1 k | ||
| 321 |
Construction of Drain and gravel at different roads, Tri.Na. Pa-13, Udayapur.
45-tm/uda/2082/083 |
Triyuga Municipality Office | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Road |
Koshi
Udayapur |
15.5 k | 1 k | ||
| 322 |
Shree Janata Ma.Vi. School First Floor Building Construction, Tri.Na. Pa-15, Udayapur.
44-tm/uda/2082/083 |
Triyuga Municipality Office | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Building / Hall / Lab |
Koshi
Udayapur |
52 k | 1 k | ||
| 323 |
Sirungkhola Rajwara Dekhi Chauka Sadak Marmat
2082/083-4re |
Gaumukhi Rural Municipality | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Road |
Lumbini
Pyuthan |
31 k | 1 k | ||
| 324 |
Kerawa Tole, Pandey Tole, Bazar Tole , Bhangahiya , Shreeram Tole Road Soil Embankment, Gravel and PCC Construction, Ward 7
12/w/sq/krm/082/083 |
Kotahimai Rural Municipality | 27/05/2026 |
03/06/2026
(4 days) |
Works
(Sealed Quotation)
Road |
Lumbini
Rupandehi |
50 k | 1 k | ||
| 325 |
Maintenance of Infrastructure Development Office Building and Kushma Playground Road.
ido/par/sq/w/01/082-83 |
Infrastructure Development Office, Parbat | 27/05/2026 |
04/06/2026
(5 days) |
Works
(Sealed Quotation)
Road |
Gandaki
Parbat |
40 k | 1 k | ||
| 326 |
Sisneri Kalpani Chaite Sadak Starunnati, bheriganga-2 (Part-2)
bgm/idb/sq/2082/083-36 |
Bheriganga Municipality,Karnali | 27/05/2026 |
04/06/2026
(5 days) |
Works
(Sealed Quotation)
Road |
Karnali
Surkhet |
25 k | 1 k | ||
| 327 |
Taasi Terchuk Gumba
srm/sq/w/01/2082/083 |
Sailung Rural Municipality | 27/05/2026 |
05/06/2026
(6 days) |
Works
(Sealed Quotation)
Religious/Tourism Site |
Bagmati
Dolakha |
30 k | 1 k | ||
| 328 |
Construction of Public Building At Mardamar, Lahan-16
lmun-w26-ifb-2082-83-31 |
Lahan Municipality | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
1.4 lakh | 3 k | ||
| 329 |
Mahakali River Training works
iwrmp/ncb/mahakali/13/082/083 |
Irrigation and Water Resources Management Project, Mahendranagar, Kanchanpur | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Mining/River Extraction |
Sudur Pashchim
Kanchanpur |
3.6 lakh | 3 k | ||
| 330 |
Godawari River Training Works
iwrmp/ncb/godawari/12/082/083 |
Irrigation and Water Resources Management Project, Mahendranagar, Kanchanpur | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Mining/River Extraction |
Sudur Pashchim
Kanchanpur |
1.7 lakh | 3 k | ||
| 331 |
Ghuraha River Training Works
iwrmp/ncb/ghuraha/11/082/083 |
Irrigation and Water Resources Management Project, Mahendranagar, Kanchanpur | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Mining/River Extraction |
Sudur Pashchim
Kanchanpur |
1.7 lakh | 3 k | ||
| 332 |
Mohana River Training Works
iwrmp/mohana/ncb-08/2082-083 |
Irrigation and Water Resources Management Project, Mahendranagar, Kanchanpur | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Mining/River Extraction |
Sudur Pashchim
Kanchanpur |
7 lakh | 5 k | ||
| 333 |
Kandra River Training Works
iwrmp/kandra/ncb-09/2082-083 |
Irrigation and Water Resources Management Project, Mahendranagar, Kanchanpur | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Mining/River Extraction |
Sudur Pashchim
Kanchanpur |
5 lakh | 5 k | ||
| 334 |
Dodha Rive Training Works
iwrmp/dodha/ncb-10/2082-083 |
Irrigation and Water Resources Management Project, Mahendranagar, Kanchanpur | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Mining/River Extraction |
Sudur Pashchim
Kanchanpur |
7 lakh | 5 k | ||
| 335 |
Construction of Ward 2 Office Building
bhmun/ncb/bldg/2082/83/03 |
Bhanu Municipality | 27/05/2026 |
16/06/2026
(17 days) |
Works
(NCB)
Building / Hall / Lab |
Gandaki
Tanahun |
5.4 lakh | 5 k | ||
| 336 |
Construction Work of Lamikhal Pothyan Drinking Water Supply Project in Aadarsh R.M.-05, Doti
wssdo-doti/ncb/works/06/082/083/doti/doti |
Water Supply & Sanitation Division Office, Doti | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Water / Irrigation / Canal |
Sudur Pashchim
Doti |
5 lakh | 3 k | ||
| 337 |
Construction Sanfebagar Airport and Haat bazaar Drinking Water Supply Project, Sanfebagar Municipality–3,4 Achham
wssdo-doti/ncb/works/05/082/083/doti/achham |
Water Supply & Sanitation Division Office, Doti | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Water / Irrigation / Canal |
Sudur Pashchim
Doti |
11.8 lakh | 5 k | ||
| 338 |
Construction of Ward No.8 Office Building (First Floor)
urm/ncb/works/10-2082/83 |
Udayapurgadhi Rural Municipality | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Building / Hall / Lab |
Koshi
Udayapur |
1.2 lakh | 3 k | ||
| 339 |
Physical Infrasrtucture works of Manavsewa Ashram, Hetauda 9, Makawanpur
udbo/mak/works/ncb/2081/82-76 |
Urban Development and Building Office, Makawanpur | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Building / Hall / Lab |
Bagmati
Makwanpur |
1.7 lakh | 3 k | ||
| 340 |
Construction of Concrete Paving Work on Various Roads in Ward No. 6
kabilasi/sarl/m.samp/w/ncb-04/082/083 |
Kabilasi Municipality,Sarlahi | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Madesh
Sarlahi |
1.3 lakh | 3 k | ||
| 341 |
Buldi River Training at Vyas-01,02, Tanahun
iwrmpt-ncb-works-22-82/83 |
Irrigation and Water Resources Management Project, Bhanu, Tanahun | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Mining/River Extraction |
Gandaki
Tanahun |
2.4 lakh | 3 k | ||
| 342 |
Melamchi Fatte Duwachaur Kakani Sermathang Chhimi Ghyangul Tarkeghyang Sadak ( Duwachaur Kakani Khanda )
idosin/w/ncb/99/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
8.5 lakh | 5 k | ||
| 343 |
Upgrading Works Of Jyamaredanda Kyareni Kakani Motarbato,Melamchi-08
idosin/w/ncb/108/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
4.1 lakh | 3 k | ||
| 344 |
Gyalthum Debisthan Pispse Chitre Golphubhanjyang Sadak,Helambu-4,Sindhupalchok
idosin/w/ncb/107/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
4.1 lakh | 3 k | ||
| 345 |
Melamchi Katunje Dhuseni Dhaule Sadak,Melamchi-11, Sindhupalchok
idosin/w/ncb/106/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
95 k | 3 k | ||
| 346 |
Nursery Birtathok Sworathok Sadak,Chautara Sangachokgadhi Municipality-11,Sindhupalchok
idosin/w/ncb/105/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
95 k | 3 k | ||
| 347 |
Upgrading Works Of Bahunepati Piughar Nawalpur Chhahare Okhreni Gunsa Bhotang Chhyumdi Panchpokhari Sadakko Bahunepati Pyughar Aiselukharka Khand
idosin/w/ncb/103/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
4.1 lakh | 3 k | ||
| 348 |
Kalleri ward office jane Road, Balefi-2, Sindhupalchok.
idosin/w/ncb/102/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
66 k | 3 k | ||
| 349 |
Upgrading Work of Chapbhanjang Thatipokhari Dhadkhola Fatkeshwor Sadak(Padhere Chaur Fatkeshor Khanda),Melamchi 13,Sindhupalchok
idosin/w/ncb/101/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
11 lakh | 5 k | ||
| 350 |
Upgrading of Jambukhor Baramche Dhade Road(Jambukhor section), Barhabise-7, Sindhupalchok
idosin/w/ncb/100/082-83. |
Infrastructure Development Office Sindhupalchok | 27/05/2026 |
17/06/2026
(18 days) |
Works
(NCB)
Road |
Bagmati
Sindhupalchok |
5.6 lakh | 5 k |