| Save | S.N. | Project Title | Public Entity Name |
Envelope |
Published |
Deadline |
Procurement Type | Location |
Security |
|
|---|---|---|---|---|---|---|---|---|---|---|
| 451 |
Construction of Compound Wall, ADBL branch office Lahan
adbl/cs/14/2082/083 |
Agricultural Development Bank | Single | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
50 k | ||
| 452 |
Repair, Maintenance, Waterproofing and other office works at ADBL branch office Panitanki, Rajbiraj
adbl/cs/13/2082/083 |
Agricultural Development Bank | Single | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Saptari |
2.1 lakh | ||
| 453 |
Upgrading of Gaighat-Baniniya Road to Asphalt Concrete Ch: 22+800 to 37+100 (Traffic Chowk(MRM) to Baniniya Section), Saptari
07-2082/83/ur-31 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Madesh
Saptari |
2.5 cr | ||
| 454 |
Design and Build of Bakaiya River Bridge along Bagmati (Badharwa) Fatwa Maheshpur Aruwa road Postal Highway(NH 05), Rautahat
07-2082-83/bc-39 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Madesh
Rautahat |
1.4 cr | ||
| 455 |
Construction of 3 Cell x 6m x 6m RCC Box Culvert at Nepali Nahar Gopiganj and 3 Cell x 6m x 6m RCC Box Culvert at Panthe Khola along Narayan Chowk-Triveni Road (Hulaki Rajmarg), Nawalparasi
07-2082-83/bc-38 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
NawalParasi |
13.1 lakh | ||
| 456 |
Construction of 3 Cell x 6mx6m RCC Box Culvert at Jharana Khola (Ch-38+500) along Dokebazar-Belauri-Beldadi-Daije-Road, Kanchanpur
07-2082-83/bc-37 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Sudur Pashchim
Kanchanpur |
8.3 lakh | ||
| 457 |
Construction of 4 lane 4 cell x5mx6m RCC Box Culvert at Alipatti Bighhi khola along Janakpur-Bhittamod Road, Mahottari and 5cellx5mx4m at Aama Badha along Yadukoha-Khajuri-Mahuwa Road (Ch.6+580), Dhanusha
07-2082-83/bc-36 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Madesh
Dhanusha |
26.5 lakh | ||
| 458 |
Construction of 3 cell x 5m x 5m RCC Box Culvert at Bhaluwai Khola along Rajbiraj-Kunauli Road (Hulaki Rajmarg), Saptari
07-2082-83/bc-35 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Madesh
Saptari |
5.9 lakh | ||
| 459 |
Construction of Multicell Box Culverts across Ghagi Khola,Bhamuwa Khola, Bhaigha Khola, Gadiya Khoa and Kukur Khola along Ratuwa-Keshaliya Road Section of Postal Highway, Morang
07-2082-83/bc-34 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Koshi
Morang |
23.2 lakh | ||
| 460 |
Construction of Multicell Box Culverts across Singhri Khola, Berung Khola, Larikatta Khola, Dagra Khola and Bheruwathan Khola along Ratuwa-Keshaliya Road Section of Postal Highway, Morang
07-2082-83/bc-33 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Koshi
Morang |
30.6 lakh | ||
| 461 |
Construction of Kanchaniya Khola Bridge along Taulihawa Bahadurganj Road section of Postal Highway
07-2082-83/bc-32 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
Kapilvastu |
32.7 lakh | ||
| 462 |
Design and Build of Supaila Khola Bridge along Kalyankot-Gobardhiya-Gadhawa-Rajapur-Gothuwa-Kumber Bethani Road, Dang
07-2082-83/bc-30 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
Dang |
42.4 lakh | ||
| 463 |
Design and Build of Khajuraha Bridge, Hulasi Bridge and Bhaluhi Bridge along Tribeni Narayan chowk Parasi Road, Nawalparasi
07-2082-83/bc-29 |
Postal Highway Directorate | Two (1S2E) | 16/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
NawalParasi |
66.8 lakh | ||
| 464 |
Supply and Delivery of Meter Reading Mobile Devices
nea/pmd/dlsd/rmsp-082/83-01 |
NEA,Revenue Management System | โ | 16/07/2026 |
06/08/2026
(9 days) |
Goods
(NCB)
IT/Network/Software |
Bagmati
Kathmandu |
10 lakh | ||
| 465 |
Supply, Delivery, Erection and Installation of Ground Base Self Supporting Towers and Accessories for Karnali Province
ndcl/pdskt/ncb/09/082-83 |
Nepal Telecom, PD Surkhet | โ | 16/07/2026 |
14/08/2026
(17 days) |
Goods
(NCB)
IT/Network/Software |
Karnali
Surkhet |
8.5 lakh | ||
| 466 |
Procurement of "Local Support Service for Vmware, Commvault, Email and Active Directory System"
nrb/asmd/it/goods/sq/01/082/83 |
Nepal Rastra Bank | โ | 15/07/2026 |
31/07/2026
(3 days) |
Goods
(Sealed Quotation)
IT/Network/Software |
Bagmati
Kathmandu |
15 k | ||
| 467 |
Road Upgrading works of Singaar Sattal purba Sadak
mahalaxmi/w/sq/44/2082/83 |
Mahalaxmi Municipality, Office of Municipal Executive | Single | 15/07/2026 |
31/07/2026
(3 days) |
Works
(Sealed Quotation)
Road |
Bagmati
Lalitpur |
33.4 k | ||
| 468 |
Road upgrading works of Devi wada sadak Ward no.4
mahalaxmi/w/sq/42/2082/83 |
Mahalaxmi Municipality, Office of Municipal Executive | Single | 15/07/2026 |
31/07/2026
(3 days) |
Works
(Sealed Quotation)
Road |
Bagmati
Lalitpur |
33.4 k | ||
| 469 |
Construction of Buddha Ma Vi Building ward 8
psmun/ncb/works/2082/083-10 |
Pathari Shanishchare Municipality | Single | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Building / Hall / Lab |
Koshi
Morang |
4 lakh | ||
| 470 |
Construction of RCC framed structure administrative office building including finishing, water supply & sanitary, electrical works all complete at Hedangna Gadhi, Sankhuwasabha
nskrp/082/83-06 |
North South (KOSHI) Road Project, Khandbari | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Building / Hall / Lab |
Koshi
Sankhuwasabha |
10 lakh | ||
| 471 |
Supply Delivery, Installation and Commissioning of Internet Bandwidth, Lease Line Connectivity and Related Services
nea/itd/2082/83-07 |
NEA, Information Technology Department | โ | 15/07/2026 |
05/08/2026
(8 days) |
Goods
(NCB)
IT/Network/Software |
Bagmati
Kathmandu |
2.3 lakh | ||
| 472 |
Procurement of Information Systems (IS) Audit and Comprehensive Audit of Network appliances and Enterprise Applications
nea/itd/2082/83-06 |
NEA, Information Technology Department | Single | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Electricity /Power |
Bagmati
Kathmandu |
55 k | ||
| 473 |
Procurement of Labor Supply Services for the Provision of Technical Junior Helpers and Helpers (No-Light, Substation, and Line Maintenance), Non-Technical Office Assistants, and Vehicle Drivers for the Bagmati Provincial Office of the Nepal Electricity Authority and its Distribution Centers and Subordinate Offices.
nea/bpo/sc/2082/083-03 |
NEA, Bagmati Provincial Office | Single | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Electricity /Power |
Bagmati
Kathmandu |
N/A | ||
| 474 |
Procurement of Performance Based Maintenance and No-light service of Bhaktapur, Kuleshor, Lagankhel, Pulchowk and Thimi Distribution Center of NEA
nea/bpo/pbamc/082/083-02 |
NEA, Bagmati Provincial Office | Single | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Electricity /Power |
Bagmati
Kathmandu |
32 lakh | ||
| 475 |
Road Upgradation Works from Marang to Gumba Ghar, Lo-Ghekar Damodarkunda Ga. Pa.-01, Mustang
ido/mustang/ncb/w/r/10/082-83 |
Infrastructure Development Office (IDO) | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Gandaki
Mustang |
9 lakh | ||
| 476 |
Road Upgradation Works from Chhairo Bellybridge to Chimang via. Chho(daha) Chhairo,Gharapjhong Ga. Pa-01., Chhairo, Chimang, Mustang
ido/mustang/ncb/w/r/09/082-83 |
Infrastructure Development Office (IDO) | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Gandaki
Mustang |
19 lakh | ||
| 477 |
Chhapiya Urban Infrastructure Development Programme (Road Works),Siyari-04,Rupandehi.
udbo/rup/works/14/ncb/82/83-54 |
Urban Development and Building Office, Rupandehi | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Rupandehi |
10.7 lakh | ||
| 478 |
Dokhame Gokhunga Sauripokhari Urban Development Work (Road works),Malarani-09,Arghakhanchi.
udbo/rup/works/14/ncb/82/83-53 |
Urban Development and Building Office, Rupandehi | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Lumbini
Rupandehi |
10.7 lakh | ||
| 479 |
Construction work of building of health office,Pyuthan Municipality-3, Pyuthan.
udbo/dang/73/2082/083 (เคฏเฅ เคชเฅเคจเค เคฎเฅเคฏเคพเคฆ เคฅเคช เคเคฐเคฟเคเคเฅ เค เฅเคเฅเคเคพ เคนเฅเฅค เคตเคฟเคธเฅเคคเฅเคค เคเคพเคจเคเคพเคฐเฅเคเคพ เคฒเคพเคเคฟ เคเฅเคชเคฏเคพ เคฌเฅเคฒเคชเคคเฅเคฐเคฎเคพ เคนเฅเคฐเฅเคจเฅเคนเฅเคธเฅเฅค) |
Urban Development & Building Office Ghorahi, Dang | Two (1S2E) | 15/07/2026 |
14/08/2026
(17 days) |
Works
(NCB)
Building / Hall / Lab |
Lumbini
Dang |
12.5 lakh | ||
| 480 |
Laying of Cement Concrete Interlocking Blocks on Safal Siddhartha Academy way road, Sundarharaincha 05
shm/ncb/w/72/2082/083 |
Sundarharaicha Municipality | Single | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Road |
Koshi
Morang |
69 k | ||
| 481 |
Fabrication, Supply, Transportation, Construction and Erection of Shree Sarada Ma.Vi Ra Bada No 8 Aspatal Najik Trail Bridge, Sindupalchowk, span 128m (D Type)
lidpo/htd/w/ncb/082-83/tb/1 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Sindhupalchok |
3.5 lakh | ||
| 482 |
Fabrication, Supply, Transportation, Construction and Erection of Mathillo Donggang Jholunge Pul,Gaurishankar-05,Dolakha
lidpo/htd/w/ncb/082-83/tb/04 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Dolakha |
13.2 lakh | ||
| 483 |
Fabrication, Supply, Transportation, Construction and Erection of Baikuntheshwor Mahadev Mandir Jane Tunamuna Kholama Jholunge Pul, Madi Na. Pa.-8, Chitwan
lidpo/htd/w/ncb/082-83/tb/03 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Chitwan |
1 lakh | ||
| 484 |
Design and Build of Bhotekoshi khola Baseri moterable Pul,Bahrabishe nagarpalika,Sindhupalchowk
lidpo/htd/w/ncb/082-83/mb/05 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Sindhupalchok |
39.8 lakh | ||
| 485 |
Design and Build of Madal Si Chaukitar Pakki Pul, Rakshirang Ga.Pa.-4, Makwanpur
lidpo/htd/w/ncb/082-83/mb/04 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Makwanpur |
32 lakh | ||
| 486 |
Design and Build of Janunne Kawashe Pakki Pul Nirman, Thaha Nagarpalika-07, Makawanpur
lidpo/htd/w/ncb/082-83/mb/03 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Makwanpur |
19 lakh | ||
| 487 |
Construction of Simrahani Hundai Majhuwa Chitai Khola Motorable Bridge, Madi Municipality-2, Chitwan
lidpo/htd/w/ncb/082-83/mb/02 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Chitwan |
16 lakh | ||
| 488 |
Construction of Yorgyan khola Motorable Pakki Pul Nirman, Rubivalley 1, Dhading.
lidpo/htd/w/ncb/082-83/mb/01 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Dhading |
26 lakh | ||
| 489 |
Fabrication, Supply, Transportation, Construction and Erection of Bhattedanda-Ikudol Trail Bridge over Khani Khola River with span 522 m.
lidpo/htd/ifb/works/082-83/tb/2 |
Local Infrastructure Development Project Office (LIDPO), Hetauda | Two (1S2E) | 15/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Lalitpur |
18.2 lakh | ||
| 490 |
Maintenance of spillway, canal and gravel trap
nea-thps-2082/83-cst-04 |
NEA, Trishuli Hydropower Station | Two (1S2E) | 15/07/2026 |
14/08/2026
(17 days) |
Works
(NCB)
Water / Irrigation / Canal |
Bagmati
Nuwakot |
6 lakh | ||
| 491 |
Floor extension works and truss works
nea-thps-2082/083-cst-05 |
NEA, Trishuli Hydropower Station | Single | 15/07/2026 |
14/08/2026
(17 days) |
Works
(NCB)
Building / Hall / Lab |
Bagmati
Nuwakot |
1.6 lakh | ||
| 492 |
Consulting Services for Hardware and Software Maintenance, System Inspection, Calibration, Emergency Maintenance Support, and Preventive Maintenance of Three (3) C-Band Weather Radar Stations in Nepal.
brch/c/eoi/icb/01-2083/84 |
Building Resilience to Climate-Related Hazards Project | โ | 15/07/2026 |
14/08/2026
(17 days) |
Consultancy
(QCBS)
IT Service |
Bagmati
Kathmandu |
N/A | ||
| 493 |
Construction of 5 no Ward Office Building at Aiselukharka-5, Maheshwari
arm-kho-24/2082-083/ncb/works |
Aiselukharka Rural Municipality | Single | 15/07/2026 |
04/08/2026
(7 days) |
Works
(NCB)
Building / Hall / Lab |
Koshi
Khotang |
4.1 lakh | ||
| 494 |
Construction of Intake Structure, Distribution System and Pumping Unit for Mathuranagar Lift Irrigation Project, Bansgadhi-02, Bardiya
wriddo/bardiya/ncb-03/082-83 |
Water Resources and Irrigation Development Division Office, Bardia | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Water / Irrigation / Canal |
Lumbini
Bardiya |
6.5 lakh | ||
| 495 |
Road Improvement & Upgrading Works Including Structural Works Alongs Triveni-Topla section Rara Rajmarga (NH56) Jumla
tnn1/rdjml33701138-4/083/84-01 |
Road Division, Jumla | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Karnali
Jumla |
10.1 lakh | ||
| 496 |
Road Improvement & Upgrading Works Including Structural Works Along Patmara-Khali Section of Khalanga Jumla Khali Bhulbhule Talcha Rara Road(NH 56), Jumla
tnn1/rdjml/33701193-4/083/84-02 |
Road Division, Jumla | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Karnali
Jumla |
12.7 lakh | ||
| 497 |
Road Improvement & Upgrading Works Including Structural Works Along Manang Mustang Dolpa Jumla Road Jumla
tnn1/rdjml/33701141-4/083/84-03 |
Road Division, Jumla | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Karnali
Jumla |
7.6 lakh | ||
| 498 |
Road Upgrading to Blacktop Works Including Structural Works Along Dewargaun (Ch:-15+000) To Acharyalihi (Ch:-16+500) Section of Surkhet Dailekh Mahabulekh Galje Nagma Gamgadhi Nakchelagna Road (NH-60) Jumla.
tnn1/rdjml/33701138-4/083/84-07 |
Road Division, Jumla | Two (1S2E) | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Karnali
Jumla |
10.1 lakh | ||
| 499 |
Cross Drainage and Road upgrading works along Nagma-Jumla section of Karnali Highway
tnn1/rdjml/33701138-4/083/84-06 |
Road Division, Jumla | Single | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Karnali
Jumla |
6.6 lakh | ||
| 500 |
Road Upgrading with Blacktop Works along Talcha(Ch:-0+000) - Salleri (Ch:-3+600) Section of Rara Highway (NH-56), Mugu
tnn1/rdjml/33701138-4/083/84-04 |
Road Division, Jumla | Single | 15/07/2026 |
05/08/2026
(8 days) |
Works
(NCB)
Road |
Karnali
Jumla |
13 lakh |