| 🛠 Category → Bridge/Culvert | Tender No → ncb-ls--35/082/83 | 🏬 Publisher → Suspension Bridge Division (SBD) | |
| 🔍 Type → Works (NCB) | 📅 Published → 16/07/2026 | ⏰ Deadline → 06/08/2026 (8 days left) | |
| 💰 Security → 200000.00 | 💵 Doc Fee → N/A | 📍 Location → Koshi, Khotang | 📄 Envelope → Two (1S2E) |
| Download PDF | |||
Turnover
☞ No minimum average annual construction turnover amount was specified.
Bid Capacity
☞ No bidding capacity amount was specified.
Cash Flow
☞ No amount for access to financial resources to meet cash-flow requirement was specified.
Similar Projects
☞ No specific similar projects/work experience (number of contracts, minimum value per contract, project type, years, role required) were explicitly stated.
Key Activities
☞ The project involves the fabrication, supply, transportation, construction, and erection of the Pilampa Suspended Trail Bridge, Khotang over the Pilampa river, spanning 182m.
☞ Procurement of all construction materials (except wire ropes & bulldog grips) is required.
☞ Fabrication and supply of steel parts are required.
☞ Transportation of construction materials up to the construction site is required.
☞ Bridge construction and erection all complete are required.
☞ Cover cost of equipment, tools, labour, travel, running and maintenance of camp, cost for supervision, allocation for uncertainties, overhead and contingencies etc. are required.
☞ Supply & Fabrication of Structural Steel: 12,078 kg.
☞ Supply & Fabrication of Reinforcement Steel: 1,270 kg.
☞ Supply of Ø 13mm Thimbles: 104 pieces.
☞ Supply of Ø 26mm Thimbles: 4 pieces.
☞ Supply of Ø 32mm Thimbles: 4 pieces.
☞ Supply of Ø 13mm Bulldog Grips: 312 pieces.
☞ Supply of Ø 26mm Bulldog Grips: 20 pieces.
☞ Supply of Ø 32mm Bulldog Grips: 24 pieces.
☞ Supply of Wiremesh Netting: 485 m².
☞ Supply of Sign Board: 2 pieces.
☞ Supply of Bolts, Nuts, Washers: 314 kg.
☞ Supply of 10 SWG GI Binding wire: 58 kg.
☞ Hot Dip Galvanization: 11,419 kg.
☞ Transportation of Material and Equipment: 33,299 kg.
☞ Transportation of Wire Ropes: 9,564 kg.
☞ Site Clearance: 124 m².
☞ All Excavation of Soil: 58 m³.
☞ Foundation Excavation of Soil: 45 m³.
☞ Backfilling: 3 m³.
☞ Reinf Cement Concrete 1:2:4: 32 m³.
☞ Plum Concrete 40%: 17 m³.
☞ Form Work: 17 m².
☞ Rubble Masonry 1:6: 14 m³.
☞ Rubble Masonry 1:4: 23 m³.
☞ 1:4 Cement Plaster 20mm thick: 105 m².
☞ Hoisting of Main Cable: 182 meters.
☞ Hoisting of Windties & Stabilizing Cables: 50 pieces.
☞ Erection of Walkway: 182 meters.
☞ Coaltar Application: 182 meters.
☞ Site Installation and Supervision: 1 Unit.
☞ Dismantling of Masonry Structures: 10 m³.
☞ Repainting of Steel parts: 1 m².
☞ Laboratory testing of materials: 1 job.