| 🛠 Category → Electricity /Power | Tender No → nea/dcsd/ptsd/sorep/082/83-03 | 🏬 Publisher → NEA, Solukhumbu-Okhaldhunga 33 kV Rural Electrification and Sub-station Construction Project | |
| 🔍 Type → Works (NCB) | 📅 Published → 16/07/2026 | ⏰ Deadline → 06/08/2026 (8 days left) | |
| 💰 Security → 1150000.00 | 💵 Doc Fee → N/A | 📍 Location → Koshi, Okhaldhunga | 📄 Envelope → Two (1S2E) |
| Download PDF | |||
Turnover
☞ Minimum average annual construction turnover of NRs 5,25,50,000 based on best 3 years within the last 10 fiscal years.
Bid Capacity
☞ Bidding capacity must be equal to or more than NRs 3,50,50,000.
Cash Flow
☞ Bidder must demonstrate access to financial resources of NRs 1,46,00,000 to meet cash-flow requirement.
Similar Projects
☞ One contract of electrical network of 11kV or above voltage level and/or substations with a minimum value of NRs 1,75,20,000, as prime contractor, management contractor, or subcontractor, completed or substantially completed within the last 10 years.
Key Activities
☞ Electrical Network Installation: minimum 4 ckt-km of electrical network of 11 kV or higher voltage level.
☞ Pre-Construction Survey, Geographical Mapping, Drawing, Staking, Preparation of Structure Data Sheet, Single Line Diagram & Initial Bill of Quantity: 59 ckt-km per year.
☞ Preparation of Final Bill of Quantity and Distribution System Final drawings as per built, SDS, Detail Project Completion Report (DPCR), Testing & Charging of electric distribution system and handover with all documentation to NEA: 59 ckt-km per year.
☞ Erection of 11 meter Steel Tubular Pole: 97 Nos per year.
☞ Erection of 8 meter Steel Tubular Pole: 395 Nos per year.
☞ Stringing of 55 sq mm XLPE Cover Conductor (HT 1-Wire) with required accessories: 12 km per year.
☞ Stringing of 3x50+1x35 sq mm AB Cable (LT) with required accessories: 22 km per year.
☞ Stringing of 4x25 sq mm AB Cable (LT) with required accessories: 16.50 km per year.
☞ Stringing of 2x25 sq mm AB Cable (LT) with required accessories: 16.50 km per year.
☞ Installation of Stay Set (Type A): 258 Set per year.
☞ Installation of Stay Set (Type C): 4 Set per year.
☞ Installation of 11 kV Disconnecting switch: 1 Set per year.
☞ Installation of 25 kVA Distribution Transformer with complete platform channels, lightening arrester, D/O Earthing sets: 3 Set per year.
☞ Installation of 50 kVA Distribution Transformer with complete platform channels, lightening arrester, D/O Earthing sets: 3 Nos per year.
☞ Fitting of MCCB Box properly with complete set: 6 Set per year.
☞ Transportation of materials from Biratnagar port to respective side by truck: 1 Lot per year.