| 🛠 Category → Bridge/Culvert | Tender No → lidpo/btl/ncb/bri/082-83/08 | 🏬 Publisher → Local Infrastructure Development Project Office(LIDPO), Lumbini Province,Butwal | |
| 🔍 Type → Works (NCB) | 📅 Published → 16/07/2026 | ⏰ Deadline → 06/08/2026 (8 days left) | |
| 💰 Security → 3100000.00 | 💵 Doc Fee → N/A | 📍 Location → Lumbini, Dang | 📄 Envelope → Two (1S2E) |
| Download PDF | |||
Turnover
☞ Minimum average annual construction turnover requirements are: NRs 92,350,000 for Contract ID LIDPO/BTL/NCB/BRI/082-83/08, NRs 93,090,000 for Contract ID LIDPO/BTL/NCB/BRI/082-83/09, NRs 54,160,000 for Contract ID LIDPO/BTL/NCB/BRI/082-83/10, NRs 58,150,000 for Contract ID LIDPO/BTL/NCB/BRI/082-83/11, and NRs 33,470,000 for Contract ID LIDPO/BTL/NCB/TB/082-83/12, based on the best three years within the last ten fiscal years.
Bid Capacity
☞ Required Bid Capacity is NRs 111,000,000.
Cash Flow
☞ The bidder must demonstrate access to financial resources of NRs 15,400,000 to meet cash-flow requirements.
Similar Projects
☞ For Construction of Kakrahawa Khola Prestressed Motorable Bridge (4 x 30m): One contract of RCC Motorable Bridge construction with a value of at least NRs 73,880,000, completed within the last 10 years.
☞ For Construction of Bardagoriya Panvara Prestressed Box Girder Bridge (1x50m): One contract of RCC Motorable Bridge construction with a value of at least NRs 74,470,000.
☞ For Construction of Satmure PSC Motorable Bridge: One contract of RCC Motorable Bridge construction with a value of at least NRs 25,270,000.
☞ For Construction of Multi-Cell Box Culvert Over Bhaluhi Khola: One contract of Motorable Bridge/Box Culvert construction with a value of at least NRs 19,380,000.
☞ For Fabrication, Supply, Transportation, Construction and Erection of Chunaha to Chhapargaudi Suspension Trail Bridge, Banke (Span-364.5m): One contract of Fabrication, Supply, Transportation, Construction and Erection of Trail Bridge with a value of at least NRs 17,850,000.
Key Activities
☞ For Construction of Kakrahawa Khola Prestressed Motorable Bridge (4 x 30m): Construction of at least one multi-span bridge with individual span greater than 25 meters and total length not less than 96 meters with deep foundation, OR construction of at least one multi-span bridge with individual span greater than 25 meters and total length not less than 96 meters AND one bridge with deep foundation, within the last 10 years.
☞ For Construction of Bardagoriya Panvara Prestressed Box Girder Bridge (1x50m): Construction of at least one Prestressed Concrete (PSC) Box Girder Bridge of length not less than 40 meters with deep foundation, OR construction of at least one Prestressed Concrete (PSC) Box Girder Bridge of length not less than 40 meters AND one bridge with deep foundation, within the last 10 years.
☞ For Construction of Satmure PSC Motorable Bridge: Construction of at least one Prestressed Concrete (PSC) Bridge of length not less than 36 meters within the last 10 years.
☞ For Construction of Multi-Cell Box Culvert Over Bhaluhi Khola: Minimum annual construction rate of Cement Concrete (M30 or above) of 475 cubic meters and Reinforcement Works of 50 tonnes, within the last 10 years.
☞ For Fabrication, Supply, Transportation, Construction and Erection of Chunaha to Chhapargaudi Suspension Trail Bridge, Banke (Span-364.5m): Construction of at least one N-Type trail bridge of length not less than 290 meters with deep foundation, OR construction of at least one N-Type trail bridge of length not less than 290 meters AND one bridge with deep foundation, within the last 10 years.