| 🛠 Category → Bridge/Culvert | Tender No → ncb-ls-08/082/83 | 🏬 Publisher → Suspension Bridge Division (SBD) | |
| 🔍 Type → Works (NCB) | 📅 Published → 08/07/2026 | ⏰ Deadline → 29/07/2026 (0 days left) | |
| 💰 Security → 804000.00 | 💵 Doc Fee → 5000.00 | 📍 Location → Bagmati, Kavrepalanchok | 📄 Envelope → Two (1S2E) |
| Download PDF | |||
Turnover
☞ Minimum average annual construction turnover of NRs 3,09,19,000 based on best 3 years within last 10 fiscal years.
Bid Capacity
☞ Bidding capacity must be equal to or more than NRs 2,81,36,000.
Cash Flow
☞ Bidder must demonstrate access to financial resources of NRs 68,71,000 to meet cash-flow requirement.
Similar Projects
☞ One contract within the last 10 years, with a value of at least NRs 1,23,67,500, similar in physical size, complexity, methods, technology, or other characteristics as described for Fabrication, Supply, Transportation, Construction, and Erection of Trail bridge, as prime contractor, management contractor, or subcontractor.
Key Activities
☞ Plum concrete: minimum 254 cum per year in any one year within last 10 years.
☞ Hoisting of main cable: minimum 159 m per year in any one year within last 10 years.