| 🛠 Category → Road |
Tender No →
ido/rau/ncb/w/19/2081/2082
(यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
🏬 Publisher → Infrastructure Development Office , Rautahat | |
| 🔍 Type → Works (NCB) | 📅 Published → 29/06/2026 | ⏰ Deadline → 31/07/2026 (2 days left) | |
| 💰 Security → 1600000.00 | 💵 Doc Fee → 5000.00 | 📍 Location → Madesh, Rautahat | 📄 Envelope → Two (1S2E) |
| Download PDF | |||
Turnover
☞ Minimum average annual construction turnover of NRs 58,000,000 based on the best 3 years within the last 10 years.
Bid Capacity
☞ Required Bid Capacity is NRs 46,000,000.
Cash Flow
☞ Construction cash flow requirement is NRs 10,000,000.
Similar Projects
☞ Participation as prime contractor, management contractor, or subcontractor within the last 10 years in one Asphalt Concrete/Rigid Pavement Road Project with a value of at least NRs 23,129,000, or for a Joint Venture, one partner must meet a requirement of at least NRs 5,782,000 and the combined Joint Venture must meet a requirement of at least NRs 23,129,000.
☞ For Project 2, similar experience requires one Asphalt Concrete Road Project with a value of at least NRs 24,623,000 for one partner, and for each JV partner, a contract value of NRs 6,156,000, all within the last 10 years.
☞ For Project 3, similar experience requires one Asphalt Concrete Road Project with a value of at least NRs 16,464,000 for one partner, and for each JV partner, a contract value of NRs 4,116,000, all within the last 10 years.
☞ For Project 4, similar experience requires one Asphalt Concrete Road Project with a value of at least NRs 32,037,000 for one partner, and for each JV partner, a contract value of NRs 8,009,000, all within the last 10 years.
☞ For Project 5, similar experience requires one Asphalt Concrete/Rigid Pavement Road Project with a value of at least NRs 11,048,000 for one partner, and for each JV partner, a contract value of NRs 2,762,000, all within the last 10 years.
Key Activities
☞ RCC M20 or above grade concrete production rate of 349 cubic meters per year.
☞ Reinforcement production rate of 21 metric tons per year.
☞ Asphalt production rate of 135 cubic meters per year.