| 🛠 Category → Bridge/Culvert |
Tender No →
ido-naw(bse)-w-ncb-ctp-02-2082/83
(यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
🏬 Publisher → Infrastructure Development Office, kawasoti, Nawalparasi(Bardaghat Susta East), Gandaki Province | |
| 🔍 Type → Works (NCB) | 📅 Published → 23/06/2026 | ⏰ Deadline → 06/08/2026 (8 days left) | |
| 💰 Security → 900000.00 | 💵 Doc Fee → 5000.00 | 📍 Location → Gandaki, Nawalpur | 📄 Envelope → Two (1S2E) |
| Download PDF | |||
Turnover
☞ Minimum average annual construction turnover of NRs 5,24,00,000 based on best 3 years within last 10 fiscal years.
Bid Capacity
☞ Bidding Capacity must be more than NRs 3,49,00,000.
Cash Flow
☞ Bidder must demonstrate access to financial resources of NRs 1,17,00,000 to meet cash-flow requirement.
Similar Projects
☞ One contract for Construction of trail Bridge with a minimum value of NRs 1,39,60,000, completed or substantially completed within the last 10 years as prime contractor, management contractor, or subcontractor.
Key Activities
☞ Structural Steel: minimum 51758 kg per year.
☞ Reinforcement Steel: minimum 5433 kg per year.
☞ Supply of Thimbles Ø 13mm: minimum 248 pc per year.
☞ Supply of Thimbles Ø 32mm: minimum 4 pc per year.
☞ Supply of Thimbles Ø 36mm: minimum 4 pc per year.
☞ Supply of Thimbles Ø 40mm: minimum 16 pc per year.
☞ Supply of Buldog Grips Ø 13mm: minimum 744 pc per year.
☞ Supply of Buldog Grips Ø 32mm: minimum 24 pc per year.
☞ Supply of Buldog Grips Ø 36mm: minimum 28 pc per year.
☞ Supply of Buldog Grips Ø 40mm: minimum 128 pc per year.
☞ Wiremesh Netting: minimum 702 m² per year.
☞ Sign Board: minimum 2 pc per year.
☞ Bolts, Nut and Washers: minimum 1011 kg per year.
☞ Bolts, Nut Washers HSFG: minimum 1178 kg per year.
☞ 10 SWG GI Binding wire: minimum 91 kg per year.
☞ Hot Dip Galvanization: minimum 47829 kg per year.
☞ Transportation Material & Equipment: minimum 228757 kg per year.
☞ Transportation Wire Ropes: minimum 33257 kg per year.
☞ Site Clearence: minimum 148 m² per year.
☞ All Excavation Soil: minimum 10 m³ per year.
☞ All Excavation Soft Rock: minimum 1 m³ per year.
☞ All Excavation Hard Rock (quarrying): minimum 0 m³ per year.
☞ Foundation Excavation Soil: minimum 501 m³ per year.
☞ Foundation Excavation Soft Rock: minimum 78 m³ per year.
☞ Foundation Excavation Hard Rock (quarrying): minimum 70 m³ per year.
☞ Foundation Backfilling: minimum 101 m³ per year.
☞ Concrete Works Plain Lean Concrete 1:4:8: minimum 27 m³ per year.
☞ Concrete Works Plain Mass Concrete 1:3:6: minimum 6 m³ per year.
☞ Concrete Works Reinf. Cement Concrete 1:2:4: minimum 48 m³ per year.
☞ Concrete Works Plum Concrete 40%: minimum 863 m³ per year.
☞ Concrete Works Form Work: minimum 169 m² per year.
☞ Rubble Masonry 1:4: minimum 267 m³ per year.
☞ Cement Plaster 1:4, 20mm thk: minimum 128 m² per year.
☞ Erection/Finishing Work Erection of Towers: minimum 65 m per year.
☞ Erection/Finishing Work Hoisting of Main Cable: minimum 285 m per year.
☞ Erection/Finishing Work Hoist of Windti & Stabl Cable: minimum 163 pc per year.
☞ Erection/Finishing Work Erection of Walkway for: minimum 285 m per year.
☞ Erection/Finishing Work Coaltar Application: minimum 285 m per year.
☞ Insurance of total project: minimum 1 job per year.