| Save | S.N. | Project Title | Public Entity Name |
Envelope |
Published |
Deadline |
Procurement Type | Location |
Security |
|
|---|---|---|---|---|---|---|---|---|---|---|
| 651 |
Road Upgrading Works along Chhusang-Vena Section (Ch: 111+800 to 131+900) of Kaligandaki Corridor (Beni-Jomsom-Korala); KCBJKRP/337011184/NCB/082/83-9
ifb03/082/083-09 |
kaligandaki Corridor (Beni-Jomsom-Korola ) Road Project | Two (1S2E) | 10/07/2026 |
03/08/2026
(6 days) |
Works
(NCB)
Road |
Gandaki
Mustang |
3 cr | ||
| 652 |
Makalu Gaupalikaley Afno Chetra Bhitra Utpadan Huney Aianchi, Lakadi, kawadi lagayat Anya Maalsaman Afno Chetra Bhahira Laijaada Isthaniya Sulka Uthauney Karya.
1/r/mrm/2083/084 |
Makalu Gaupalika | — | 10/07/2026 |
31/07/2026
(3 days) |
Goods
(NCB)
Revenue Collection |
Koshi
Sankhuwasabha |
N/A | ||
| 653 |
Horizontal Extension of Kot Ghar
na/depo/work/083/84/01 (यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
Sainik Gatthaghar | Single | 09/07/2026 |
31/07/2026
(3 days) |
Works
(Sealed Quotation)
Building / Hall / Lab |
N/A | 50 k | ||
| 654 |
Ronga Timbusing Chilime Khola Pul, Rasuwa
ifb-06/myb-26/2082/83 (यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
Infrastructure Development Office, Rasuwa | Two (1S2E) | 09/07/2026 |
31/07/2026
(3 days) |
Works
(NCB)
Bridge/Culvert |
Bagmati
Rasuwa |
44 lakh | ||
| 655 |
Procurement of MIV-Bypass line valves, Spare parts and others pumps
klii-2082/083-em/st-12 (यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
NEA, Kulekhani Second Hydropower Station | — | 09/07/2026 |
07/08/2026
(10 days) |
Goods
(NCB)
Machinery/Tools |
Bagmati
Makwanpur |
3.9 lakh | ||
| 656 |
Procurement of Office Security Service
dofe-2083/84-1 |
Department of Foreign Employment | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
HR/Manpower |
Bagmati
Kathmandu |
78.9 k | ||
| 657 |
Supply, Delivery, Installation, Testing and Commissioning of 110V,400Ah MFVRLA Battery at Mainahiya, Shivapur, Gandak and New- Butwal SS
re/bgd/2082/083-05 (यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
NEA, Butwal Grid Division | — | 09/07/2026 |
31/07/2026
(3 days) |
Goods
(NCB)
Electricity/Power |
Lumbini
Rupandehi |
1.1 lakh | ||
| 658 |
Felling and Logging of Marked Trees, Debarking of Logs, Transporting to Specified Log-yard, Piling and Stacking Fire-wood at Forests inside Hetauda Campus, Institute of Forestry, Hetauda, Makawanpur District
nbnl/p/ncb/s/2082/83-10 |
Nepal Ban Nigam Limited | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Utilities / Facility |
Bagmati
Makwanpur |
1.8 lakh | ||
| 659 |
Procurement of Security Guard Services for KNPI
ctevt/knpi/security/e-bid/2082/83/1 |
Korea Nepal Polytechnic Institute | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
HR/Manpower |
Lumbini
Rupandehi |
N/A | ||
| 660 |
Upgrading to Blacktop (Asphalt Concrete Works) of Tamor Corridor (Chatara Mulghat Road Section) NH-06 Chainage 9+910 - 25+200
tc(cms)rp/33701174/082/83-01 |
Tamor Corridor (Chatara-Mulghat-surangkhola)Project | Two (1S2E) | 09/07/2026 |
30/07/2026
(2 days) |
Works
(NCB)
Road |
Koshi
Sunsari |
2.4 cr | ||
| 661 |
Construction of Asphalt Concrete Road, i.Ferkagachhi Paschim Health Post-Jabbar Chowk Jane Road ii.Dronachary Bhavan Purba -Pranami Mandir-Mechi Rajmarga, Kachankawal-2 and 4, Jhapa
ncb/works/kkrm/2082-83/17 |
Kachankawal Rural Municipality | Single | 09/07/2026 |
30/07/2026
(2 days) |
Works
(NCB)
Road |
Koshi
Jhapa |
3.6 lakh | ||
| 662 |
Construction of Asphalt Concrete Road + RCC Box Culvert, i.Taraban Panchanan Rajbanshi ko Ghar dekhi Karki Gaun Jane Road ii.RCC Box culvert, Nila Chowk Paschim Wagle ko Ghar Jane Road, Kachankawal-06, Jhapa
ncb/works/kkrm/2082-83/16 |
Kachankawal Rural Municipality | Single | 09/07/2026 |
30/07/2026
(2 days) |
Works
(NCB)
Road |
Koshi
Jhapa |
2.4 lakh | ||
| 663 |
Construction of Asphalt Concrete + RCC Road, i. Baniyani Ilaka Dakshin-Shanti Chowk Jane Sadak. ii.Bidhyut Office Uttar-Singimari Bal Pra.Bi. Jodne Sadak Kachankawal-06, Jhapa
ncb/works/kkrm/2082-83/15 |
Kachankawal Rural Municipality | Single | 09/07/2026 |
30/07/2026
(2 days) |
Works
(NCB)
Road |
Koshi
Jhapa |
3.7 lakh | ||
| 664 |
Fabrication, Supply, Transportation, Construction and Erection of Naurikot - Gorusangbo Suspended Bridge, Thansang RM, Mustang
lidpo/pkr/ifb/tb/01-082-83 (यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
Local Infrastructure Development Project Office, Pokhara | Two (1S2E) | 09/07/2026 |
06/08/2026
(9 days) |
Works
(NCB)
Bridge/Culvert |
Gandaki
Mustang |
13 lakh | ||
| 665 |
Supply, Delivery, Installation, Testing and Commissioning of 400 V, ACB Incomer Panel, Motorized ATS & 7.2 KV, VCB at MKHPS.
re-mkhps-2082/083-et-14 |
NEA, Modi Khola Hydropower Station | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Electricity/Power |
Koshi
Sankhuwasabha |
1 lakh | ||
| 666 |
Supply and Delivery of Stationery and Other Items, Itahari Hospital, Sunsari
itr/ncb/9g/082/083 |
Itahari hospital | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Office Supplies |
Koshi
Sunsari |
1.6 lakh | ||
| 667 |
Supply and Delivery of Sanitary/Hygiene Related and Other Items, Itahari Hospital, Sunsari
ih/ncb/8g/083/084 |
Itahari hospital | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Medical/Healthcare |
Koshi
Sunsari |
80 k | ||
| 668 |
Supply and Delivery of Various Forms, Letter Heads and Other Printing Items, Itahari Hospital, Sunsari
ih/ncb/7g/083/084 |
Itahari hospital | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Office Supplies |
Koshi
Sunsari |
1.1 lakh | ||
| 669 |
Supply and Delivery of Serology and Related Items, Itahari Hospital, Sunsari
ih/ncb/6g/083/084 |
Itahari hospital | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Medical/Healthcare |
Koshi
Sunsari |
4.5 lakh | ||
| 670 |
Supply and delivery of Reagents/Kits/Consumables for Chemiluminescence Immunoassay Analyzer (Architect i1000SR-Abbott) and Related items (Item-wise), Itahari Hospital, Sunsari
ih/ncb/5g/083/084 |
Itahari hospital | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Medical/Healthcare |
Koshi
Sunsari |
2 lakh | ||
| 671 |
Supply and Delivery of Surgical, Lab and Related Items, Itahari Hospital, Sunsari
ih/ncb/10g/083/084 |
Itahari hospital | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Lab Equipment |
Koshi
Sunsari |
4.5 lakh | ||
| 672 |
Supply of Security Services
ctevt-sppo-securitye-bid-2082/83-1 |
Sudurpaschim Province Office | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
HR/Manpower |
Sudur Pashchim
Kailali |
N/A | ||
| 673 |
Supply and Delivery of Compact SUV as per Specification
bmc/ncb/goods/2082/083/19 |
Birgunj Metropolitan City | — | 09/07/2026 |
30/07/2026
(2 days) |
Goods
(NCB)
Vehicle/Automobile |
Madesh
Parsa |
3.3 lakh | ||
| 674 |
Construction of 5 Seater Toilet
na/wdsthapaitsewa/ncb/works/083/84/02 (यो पुनः म्याद थप गरिएको ठेक्का हो। विस्तृत जानकारीका लागि कृपया बोलपत्रमा हेर्नुहोस्।) |
Western Division Sthapati Sewa | Single | 08/07/2026 |
30/07/2026
(2 days) |
Works
(Sealed Quotation)
Building / Hall / Lab |
Lumbini
Banke |
50 k | ||
| 675 |
LT line construction works at Dhanpalthan Ward no. 1 to 7, Jahada Ward no. 5 and 6 and Rangeli Ward no. 4,5,6 and 7
nea-rdc-2082/083-ncb-02 |
NEA, Rangeli Distribution Center | Single | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Electricity /Power |
Koshi
Morang |
1 lakh | ||
| 676 |
Gabion Structural works at Bagela Ghola of Rohini-6 Lalitpur Bhatti chowk to Bisunpura Road Section; RDBTL/337310113/082/83-43
rdbtl-082/83-8-05 |
Road Division, Butwal | Single | 08/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
Rupandehi |
2.4 lakh | ||
| 677 |
Upgrading/Improvement of Tilottama Kanchhi bazaar to Devdaha Birta Bazaar Road; RDBTL/337310113/082/83-42
rdbtl-082/83-8-04 |
Road Division, Butwal | Single | 08/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
Rupandehi |
2.4 lakh | ||
| 678 |
Upgrading of Road Connecting Shantinagar Chowk, Devdaha-8 to Bangali; RDBTL/337310113/082/83-41
rdbtl-082/83-8-03 |
Road Division, Butwal | Single | 08/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
Rupandehi |
2.4 lakh | ||
| 679 |
Upgrading/Improvement of Devdaha Municipality ward no. 7 syangjali tole(0+000m) to Pakadi (0+757m) Road Section; RDBTL/337310113/082/83-40
rdbtl-082/83-8-02 |
Road Division, Butwal | Single | 08/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
Rupandehi |
2.4 lakh | ||
| 680 |
Roadway Structure and Pavement works along Bhaluhi (MRM) to Keuli Road Devdaha, Rupandehi; RDBTL/337310113/082/83-39
rdbtl-082/83-8-01 |
Road Division, Butwal | Two (1S2E) | 08/07/2026 |
10/08/2026
(13 days) |
Works
(NCB)
Road |
Lumbini
Rupandehi |
9.3 lakh | ||
| 681 |
Supply of Air Compressor for Governor at KGAHPS
kga-2082/83-mt-08 |
NEA, Kaligandaki "A" Hydropower Station | — | 08/07/2026 |
29/07/2026
Last day |
Goods
(NCB)
Machinery/Tools |
Gandaki
Syangja |
62.5 k | ||
| 682 |
Construction of RCC Road, Ward-08
rat/chitwan/works/ncb/37/2082-83 |
Ratnanagar Municipality | Single | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Road |
Bagmati
Chitwan |
55 k | ||
| 683 |
Fabrication, Supply, Transportation, Construction and Erection of Mahuliya to Lahan Bazar Suspension Trail Bridge, Siraha/Saptari over Balan river, span 429.4m.
ncb-ur-24/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Madesh
Siraha |
18.6 lakh | ||
| 684 |
Fabrication, Supply, Transportation, Construction and Erection of Dikhuwa Rupatar Suspension Trail Bridge, Khotang over Sunkoshi river, span 367.44m.
ncb-ur-23/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Koshi
Khotang |
8.3 lakh | ||
| 685 |
Fabrication, Supply, Transportation, Construction and Erection of Kukhuretar Suspended Trail Bridge, Ramechhap/Sindhuli over Sunkoshi river, span 258m.
ncb-ur-07/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Ramechhap |
6.6 lakh | ||
| 686 |
Fabrication, Supply, Transportation, Construction and Erection of Darechok Suspended Trail Bridge, Chitwan/Gorkha over Trishuli river, span 188.75m
ncb-ur-06/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Chitwan |
5.9 lakh | ||
| 687 |
Fabrication, Supply, Transportation, Construction and Erection of Narke Suspended Trail Bridge, Kavrepalanchowk over Roshi Khola, span 152m.
ncb-ur-05/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Kavrepalanchok |
5.4 lakh | ||
| 688 |
Fabrication, Supply, Transportation, Construction and Erection of Ashrang Manthali Suspension Trail Bridge, Lalitpur/Makwanpur over Bagmati river, span 534.32m.
ncb-ur-04/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Lalitpur |
18.4 lakh | ||
| 689 |
Fabrication, Supply, Transportation, Construction and Erection of Tinkhande Jerungghat Suspension Trail Bridge, Okhaldhunga/Sindhuli over Sunkoshi river, span 254.87m
ncb-ur-03/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Koshi
Okhaldhunga |
8.5 lakh | ||
| 690 |
Fabrication, Supply, Transportation, Construction and Erection of Katunjebeshi Suspended Trail Bridge, Kavrepalanchowk over Roshi river, span 200m
ncb-ur-02/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Kavrepalanchok |
7.5 lakh | ||
| 691 |
Fabrication, Supply, Transportation, Construction and Erection of Kumaragaun Suspension Trail Bridge, Bardiya over Babai river, span 573.8m
ncb-ur-01/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Lumbini
Bardiya |
27 lakh | ||
| 692 |
Fabrication, Supply, Transportation, Construction and Erection of Rigur Deurali Suspended Trail Bridge, Darchula over Rigurgaad river, span 271m through Construction turnkey Package.
ncb-ls-22/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Sudur Pashchim
Darchula |
8.2 lakh | ||
| 693 |
Fabrication, Supply, Transportation, Construction and Erection of Khaksi Suspended Trail Bridge, Kavrepalanchowk over Roshi Khola, span 161.3m through Construction Turnkey package.
ncb-ls-20/082/83 |
Suspension Bridge Division (SBD) | Single | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Kavrepalanchok |
2.4 lakh | ||
| 694 |
Fabrication, Supply, Transportation, Construction and Erection of Tinbhangale Suspended Trail Bridge, Lalitpur/Makwanpur over Bagmati Khola, span 165.5m through construction Turnkey package.
ncb-ls-19/082/83 |
Suspension Bridge Division (SBD) | Single | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Lalitpur |
3 lakh | ||
| 695 |
Fabrication, Supply, Transportation, Construction and Erection of Bajhokhet Suspended Trail Bridge, Lalitpur/Makwanpur over Bagmati river, span 346.25m through construction Turnkey package.
ncb-ls-18/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Lalitpur |
7.5 lakh | ||
| 696 |
Fabrication, Supply, Transportation, Construction and Erection of Kurintar Silingtar Suspension Trail Bridge, Gorkha/Chitwan over Trishuli river, span 232.6m through construction Turnkey package.
ncb-ls-17/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Gandaki
Gorkha |
6.4 lakh | ||
| 697 |
Fabrication, Supply, Transportation, Construction and Erection of Ghangsang Ghat Suspended Trail Bridge, Sindhuli/Okhaldhunga over sunkoshi river, span 269m through construction Turnkey package.
ncb-ls-16/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Sindhuli |
5.1 lakh | ||
| 698 |
Fabrication, Supply, Transportation, Construction and Erection of Sisne Khola Suspended Trail Bridge, Arghakhanchi over Sisne river, span 358.25m through construction Turnkey package.
ncb-ls-14/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Lumbini
Arghakhanchi |
6.9 lakh | ||
| 699 |
Fabrication, Supply, Transportation, Construction and Erection of Puchighat Suspension Trail Bridge, Sindhuli/Ramechhap over Sunkoshi river, span 242.2m through construction Turnkey package.
ncb-ls-13/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Sindhuli |
6.9 lakh | ||
| 700 |
Fabrication, Supply, Transportation, Construction and Erection of Kerabari Suspension Trail Bridge, Lalitpur/Makwanpur over Bagmati river, span 263.8m through Construction turnkey Package.
ncb-ls-11/082/83 |
Suspension Bridge Division (SBD) | Two (1S2E) | 08/07/2026 |
29/07/2026
Last day |
Works
(NCB)
Bridge/Culvert |
Bagmati
Lalitpur |
8.2 lakh |